Here is a list of work I know of. have done or got receipts for. 2010 Leaf springs and shocks. 2011 transmission checked transfer case installed new exhaust system new u joints hinges. lights and tons of smaller stuff done but no reciepts like new distributer and ignition parts. since 2012 (with me) rebuilt engine (less than a thousand miles ago) with engine block machined. all new gaskets. rebored etc clutch system (ALL) replaced: slave and master cylinders and lines. plates. bolts everything new. electrical repairs under dash. voltage stabilizer replaced. POV replaced. new engine seals front and back. new engine mounts. new electrical fuel pump. new radiator cap. radiator new. radiator inline filter added. new water pump. hub bearing kit. brake shoe kit. differential seal replaced. emergency brake line checked and adjusted. all new cooling system including pump. hoses. temp gauge. radiator. etc new gauges on dash. new wiper motor. new tie rod ends. new rear brake hose. all steering components checked and adjusted. Regular maintenance with oil changes. fluids topped up. points greased. etc. Comes with a roof rack. two spare tires. spare fuel tank. boxes of parts (eg clutch fixings. fuel pump. hinges. mirrors). hoops and canvas (needs some sewing but in good shape) and a tailgate.